General Conditions of Contract (GCC) for Solar PV Systems Supply and Installation Projects.

These conditions form part of the Contract together with the Commercial & Technical Proposal (Annex-A) and any other documents expressly referenced in the agreement.

1. Definitions and Interpretation

1.1 Key Definitions • PV System(s) or System(s): Solar photovoltaic system(s) with technical specifications detailed in Annex-A, including all modules, inverters, mounting structures, balance of system (BOS) components, batteries (if applicable), and all materials and equipment required for proper installation and commissioning to Client's satisfaction. • Project: To procure, import, supply, install, commission, and complete all Works related to the PV System(s) at the Site, and deliver to the Client in fully functional, operational condition, including but not limited to surveying, design optimization, equipment supply, installation, electrical integration, testing, commissioning, and handover. • Site: The location(s) where PV System(s) are to be installed, including roof areas, ground areas, mounting surfaces, and associated electrical rooms or equipment enclosures, with all necessary space, structural support, electricity supply, and environmental conditions provided by the Client for safe and practical installation. • Works: All activities, labor, and services required to complete the Project, including design, supply, logistics, installation, integration, electrical work, testing, performance verification, commissioning, documentation, training, and handover. • The Contract or Agreement: The written agreement between the Client and the Contractor, comprising this GCC document, the Commercial & Technical Proposal (Annex-A), and any other documents expressly referenced herein. • The Contractor: AE by Zero, operating as a business unit of Zero Pvt Ltd (Registration C04242020), with registered office at 3rd Floor, H. Azum, Ameenee Magu, Male' 20054, Republic of Maldives.

2. Scope of Work

2.1 Contractor's Scope The Contractor shall perform the following scope of work under this Contract: 1. Site Assessment and Design: Physical inspection and survey of the Site during project planning to ensure that PV System(s) can be installed without requiring structural modifications. Assessment shall include roof load capacity, orientation, shading analysis, electrical infrastructure compatibility, and interconnection requirements. The Contractor shall advise the Client of any modifications necessary to enable proper installation. 2. Procurement and Import: Procure the PV System(s) from authorized manufacturers, arrange international shipping, clear customs, and deliver to the Site. All import duties, customs clearance fees, transportation, and logistics costs are included in the agreed Project cost unless expressly stated otherwise in writing. 3. Installation and Integration: Supply all necessary labor, tools, equipment, scaffolding, and materials to install, assemble, erect, and electrically integrate PV modules, inverters, mounting structures, and BOS components. All structural modifications, roof preparation, and electrical conduit installation shall be performed by the Contractor. 4. Testing and Commissioning: Conduct comprehensive performance testing, insulation resistance testing, grounding verification, and load testing. Verify system output against design expectations. Optimize system settings and parameters to achieve design performance. 5. Permits and Connection: Obtain and coordinate all necessary permits and grid/utility connection approvals required for the Project, unless expressly stated otherwise in Annex-A (Commercial & Technical Proposal). All permit fees and connection fees are included in the Contract price. 6. Cleaning and Handover: Conduct thorough cleaning of the installation area and all equipment upon completion. Dispose of all waste and packaging materials in accordance with environmental guidelines and local regulations. 7. Documentation and Training: Provide comprehensive operation and maintenance manuals, system documentation, warranty certificates, and training to the Client's personnel on system operation, monitoring, troubleshooting, and basic maintenance. 2.2 Work Not Included in Scope The following are excluded from the Contractor's scope and shall be the responsibility of the Client: • Any structural modifications to buildings or roofs (beyond assessment and recommendations) • Air conditioning or HVAC installation for equipment rooms • Permanent electrical connections from main distribution board to equipment • STELCO meter replacement charges (if needed) • Planning permission or environmental permits not covered in Contractor's scope

3. Project Duration and Schedule

3.1 Contract Period The total contract period shall be as specified in the Commercial & Technical Proposal (Annex-A), divided as follows: (i) Supply and Procurement Phase; (ii) Installation and Commissioning Phase; and (iii) Defect Liability Period and Maintenance Period as defined in Sections 8 and 9. 3.2 Site Readiness and Delays The Client shall ensure the Site is fully prepared and ready for installation by the date specified in the Project schedule. The Client shall provide written confirmation of Site readiness at least thirty (30) days in advance. If the Site is not ready upon arrival of PV System(s): • The Contractor shall not be responsible for consequential delays in project completion. • The Contractor shall charge demurrage, storage, and re-mobilization fees if equipment must be stored at the Site or returned. • The contract period shall be extended day-for-day equivalent to the delay in providing Site readiness. • The Contractor shall resume work within fifteen (15) days of receiving written notice of Site readiness from the Client. 3.3 Electrical Supply During Installation The Client shall provide permanent electrical connections (single or three-phase as required) to the equipment room and/or installation site during the testing and commissioning phase. If the Client fails to provide electricity within the agreed timeline, the Contractor shall charge idle time and re-mobilization fees. The Contractor will re-mobilize within fourteen (14) days of receiving written request from the Client.

4. Contractor's Obligations and Performance

4.1 Quality and Workmanship • The Contractor shall engage sufficient numbers of competent, qualified, and skilled workers and technicians for performing the Works in a professional, workmanlike manner consistent with industry best practices and manufacturer specifications. • All materials supplied shall be new, of high quality, and suitable for the tropical climate of the Maldives, unless alternative materials are expressly approved by the Client in writing. • The Contractor shall ensure all installations comply with applicable electrical codes, safety standards, and equipment manufacturer specifications. 4.2 Safety and Conduct • The Contractor shall take all necessary precautionary measures to ensure the health and safety of its workers, staff, and the Client's personnel and property at all times. The Client shall not be held liable for any accidents, injuries, or damage arising from the Contractor's negligence or failure to implement safety measures. • The Contractor shall ensure all workers conduct themselves in a disciplined and orderly manner, comply with the Client's site rules, and cooperate fully with the Client's staff and other contractors to avoid disruptions or reputational harm. • If the Client requests removal of any worker due to violation of ethical norms, professional conduct, safety non-compliance, or any other justified reason, the Contractor shall comply immediately upon written notice and provide a replacement worker. • The Contractor shall be responsible for all worker visas, employment permits, insurance, and compliance with Maldivian labor laws. 4.3 Equipment and Material Inspection The Contractor shall inspect all equipment and materials upon arrival at the Site for any damage, defects, or discrepancies. The Contractor shall promptly document and report any damage or defects to the Client. The Contractor shall be responsible for the storage, protection, and safeguarding of all materials from the point of delivery until commissioning.

5. Client's Obligations

8. Prepare and make the Site available to the Contractor at no extra cost, free from any encumbrances, hazards, or obstructions. The Site shall have adequate space for temporary storage of materials, equipment staging, and safe working areas. 9. Provide permanent electrical connections (single or three-phase as required) to the equipment room or installation area during the testing and commissioning phase, as specified in the Technical Specifications. 10. Provide climate control (air conditioning) for equipment rooms if required by equipment specifications or tropical conditions, to ensure proper equipment operation and longevity. 11. Carry out any grouting, painting, finishing, or aesthetic works required at the installation site to integrate the PV System with building aesthetics. 12. Provide secure, weather-protected storage space at the Site for materials and equipment from the date of delivery until completion of installation, with appropriate protection measures (such as tarps, shelters, or storage sheds) to prevent damage from weather, theft, or vandalism. 13. Pay all STELCO meter replacement charges if needed during the installation or operation of the PV System, as such charges are excluded from the Contract price.

6. Payment Terms and Fees

6.1 Fees and Payment Schedule Fees and payment terms are as detailed in Annex-A (Commercial & Technical Proposal). The Contractor shall invoice the Client according to the agreed milestones. The Client shall make payment within seven (7) days of invoice date unless otherwise agreed in writing. 6.2 Price Inclusions The Contract price includes the following: • Site survey, assessment, and system design • All necessary permits and approvals for the Project • Grid or utility connection fees and coordination 6.3 Price Exclusions The Contract price excludes the following, which shall be borne by the Client: • STELCO meter replacement charges, if any meter replacement is required 6.4 Directors' and Shareholders' Liability If the Client is a company and fails to fulfill its financial obligations, the directors and shareholders of the Client shall bear joint and several liability for payment of any outstanding dues. This joint and several liability shall apply notwithstanding any limitation in corporate law, and the directors and shareholders expressly waive any rights or defenses that may limit their personal liability. 6.5 Currency and Exchange Rates All prices are stated in the currency specified in Annex-A. If invoices include amounts in foreign currencies (USD, EUR, CNY, etc.), conversion to MVR shall be made at the Central Bank of Maldives mid-market rate published on the invoice date, or as otherwise agreed in writing. 6.6 Interest on Late Payment Any payment not made by the due date shall accrue interest at the rate of 1.0% per calendar month, calculated from the due date until full payment is received. Interest accrues daily and compounds monthly.

7. Completion, Inspection and Handover

7.1 Completion Inspection Upon completion of all Works, the Contractor shall request in writing that the Client schedule a final inspection. The Client or its nominated representative shall inspect the completed Project within three (3) business days of receiving the completion notice. If the Client is satisfied with the quality, functionality, and appearance of the Works, the Client shall sign and return the Handover Certificate within five (5) business days. If deficiencies are identified, the Client shall provide written details of defects, and the Contractor shall rectify them within the agreed timeframe before re-inspection. 7.2 Handover and Acceptance Upon the Client's written acceptance via the Handover Certificate, the Project shall be considered complete and handed over to the Client. All risks and title to the PV System(s) shall transfer to the Client at this point, except as provided in Section 11 (Retention of Title). The warranty period shall commence on the Handover Date.

8. Warranty Against Defects

8.1 Warranty Terms The Contractor shall provide the following warranty terms for the PV System, unless otherwise stated in the Particular Conditions of Contract: • Workmanship Warranty: 5 years from the date of Handover. The Contractor warrants that all installation and integration work has been performed in a professional and workmanlike manner and shall rectify any defects in workmanship at its own cost. • Inverter Limited Warranty: 5 years from the date of Handover, covering manufacturing defects and component failures. This is the manufacturer's limited warranty; additional extended warranties may be available for purchase. • PV Panel Warranty: 15-year warranty on materials and manufacturing process defects. Additionally, a 30-year linear output warranty guaranteed, meaning the panels are warranted to maintain at least 80% of original rated output at year 25 and at least 70% at year 30. Degradation beyond this warranty shall not be considered a defect. • All warranties commence from the Handover Date as documented in the Handover Certificate. 8.2 Warranty Administration During the warranty period, any defects, faults, or failures in the PV System(s) or Contractor’s installation work shall be rectified by the Contractor at its own cost. The Contractor shall attend to and rectify reported defects within twenty-four (24) hours of notification during working hours (Saturday–Thursday, 08:00–17:00), or within forty-eight (48) hours for Friday/public holiday reports. For manufacturer-specific defects (inverters, panels), the Contractor shall facilitate warranty claims with the respective manufacturers and coordinate repairs or replacements. 8.3 Exclusions from Warranty The warranty shall not cover defects or damage arising from: • Willful damage or negligence by the Client, its staff, agents, or authorized representatives • Improper operation, misuse, or non-compliance with operation manuals • Failure to perform regular maintenance as specified in the operation manual • Modification, repair, or tampering with the System by unauthorized third parties • Damage from natural disasters, extreme weather, flooding, or lightning strikes • Normal wear and tear or degradation of consumable components beyond the linear output warranty

9. Maintenance Obligations

9.1 Free Maintenance Period The Contractor shall provide two (2) years of free maintenance services commencing from the date of commissioning (Handover Date). During this period, all preventive maintenance, inspections, performance monitoring, repairs, and component replacements (except for client-caused damage) shall be performed at no cost to the Client. 9.2 Paid Annual Maintenance Fee Upon completion of the first two (2) years of free maintenance, the Client shall pay an annual maintenance fee to the Contractor to continue maintenance and monitoring services. The annual maintenance fee structure shall be as follows: • Initial Annual Fee (Year 3): 1.0% of the total Contract price, payable in advance. • Annual Escalation: The annual maintenance fee shall be increased by 2.75% annually thereafter, effective from the anniversary date of the first paid maintenance year. For example: Year 4 fee = Year 3 fee × 1.0275; Year 5 fee = Year 4 fee × 1.0275, and so on. • Payment Terms: Annual maintenance fees are due in advance on the anniversary date of commissioning. If payment is not received within 30 days of the due date, the Contractor may suspend maintenance services and shall charge interest at 1.0% per month on the overdue amount. 9.3 Scope of Maintenance Services The maintenance contract (whether free or paid) shall include ongoing system performance monitoring and reporting, emergency response for system failures, remote technical support and troubleshooting, and repair or replacement of failed components (parts and labor, excluding manufacturer-covered defects). In addition, the Contractor shall carry out physical on-site maintenance visits twice per year (once every six (6) months). Each on-site visit shall include the following: • Cleaning of PV panels and all associated equipment • Preventive maintenance inspection of all system components • Electrical system checks and performance testing 9.4 Optional Extended Maintenance After the initial two years of free maintenance, if the Client chooses not to enter into a paid annual maintenance contract, the Client assumes full responsibility for all maintenance and repair costs. However, the Contractor shall remain available to provide ad-hoc maintenance services at an agreed hourly rate plus cost of materials.

10. Suspension of Performance and Payment Default

10.1 Right to Suspend Work The Contractor shall have the right to suspend all work under this Contract, including installation, commissioning, maintenance, and support services, if any payment becomes overdue for more than fifteen (15) calendar days from the due date. The Contractor shall provide the Client with seven (7) days' written notice prior to exercising its right of suspension, stating the overdue amount and the deadline for payment to avoid suspension. 10.2 Effect of Suspension During any period of suspension: • The Contractor shall not be liable for any delays in completing the Project or delivering milestones. • The contract period shall be automatically extended day-for-day for the duration of the suspension. • The Client shall pay all costs incurred by the Contractor in maintaining equipment, securing the site, and remobilizing workers when suspension ends. • The warranty and maintenance period shall also be extended by the duration of the suspension. 10.3 Conditions for Resumption Work shall not resume until: 14. All overdue amounts, including accrued interest, have been paid in full. 15. The next two (2) scheduled payments have been paid in advance to the Contractor's account. 16. All costs incurred by the Contractor for suspension and remobilization have been reimbursed by the Client.

11. Retention of Title and Security Rights

11.1 Contractor's Retention of Title Notwithstanding delivery, installation, commissioning, or performance of any work, the Contractor shall retain full legal and beneficial title to all PV System(s), equipment, and materials supplied under this Contract until payment of the full Contract price (including all freight costs and interest) has been received in full and cleared in the Contractor's bank account. 11.2 Client's Acknowledgment The Client acknowledges that until final payment, it holds the PV System(s) as bailee (on bailment) for the Contractor and shall: • Maintain the PV System(s) in good working condition and repair. • Not create any lien, charge, mortgage, pledge, or encumbrance over the PV System(s). • Maintain comprehensive insurance covering the full replacement value of the PV System(s), with the Contractor named as loss payee. • Not sell, transfer, pledge, or dispose of the PV System(s) without the Contractor's prior written consent. 11.3 Right to Repossess Upon default in payment continuing for thirty (30) days after written notice, the Contractor may enter the Site and retake possession of all PV System(s), equipment, and materials. All costs of removal, storage, and reinstallation shall be borne entirely by the Client. The Contractor may sell or redeploy repossessed equipment to recover unpaid amounts.

12. Termination of Contract

12.1 Termination for Default Should either party default in the performance of its obligations under this Contract, the other party shall provide written notice specifying the default and requesting remedy. Failure to remedy the default within seven (7) calendar days of receipt of notice shall be sufficient reason for the other party to terminate this Contract by providing written notice of termination. 12.2 Termination for Payment Default The Contractor may terminate this Contract immediately upon written notice if any of the following occurs: • Any payment is overdue for thirty (30) days after written demand. • The Client becomes insolvent, makes an assignment for the benefit of creditors, or bankruptcy proceedings are commenced by or against the Client. • The Client's bank account is frozen by court order or government action. 12.3 Consequences of Termination for Payment Default Upon termination by the Contractor due to Client's payment default: • All installed PV System(s), equipment, and materials shall remain the property of the Contractor. • The Client shall be liable for all costs incurred by the Contractor to date, plus twenty-five percent (25%) thereof as liquidated damages and compensation for lost profit and business interruption. • The Contractor shall be released from all warranty and maintenance obligations. • The Client shall immediately pay all outstanding amounts plus accrued interest at 1.0% per month. 12.4 Termination for Contractor Default or Force Majeure In the event of termination due to Contractor default (if not remedied), the Client shall pay the Contractor for work completed to date on a quantum meruit basis (fair and reasonable value). If termination occurs due to a Force Majeure event beyond the Contractor's control, the Client shall pay the Contractor for all costs incurred and work performed to the date of termination, and the Contractor shall be released from further obligations.

13. Freight, Shipping and Logistics

13.1 Freight and Logistics Cost Inclusions The Contract price specified in Annex-A expressly includes all freight, shipping, transportation, and logistics costs from the point of manufacture/origin to the Site, including but not limited to: international ocean freight charges; container costs and container depot charges; port handling, terminal handling, and cargo transfer charges; bill of lading fees; marine insurance premiums and cargo insurance; customs clearance fees, import duties, and customs broker fees; and inland transportation, trucking, and ground handling within the Republic of Maldives to the Site. The Client shall bear no additional freight, shipping, customs, or logistics costs unless otherwise expressly agreed in writing.

14. Force Majeure and Supply Chain Disruption

14.1 Definition of Force Majeure Force Majeure means unforeseen events or circumstances beyond the reasonable control of either party and which, despite the exercise of due diligence, neither party is able to prevent or overcome, including but not limited to: acts of God (natural disasters, earthquakes, floods, storms, lightning, extreme weather); epidemics or pandemics; landslides and geological events; industrial disputes, strikes, lockouts, work stoppages; acts of war, armed conflict, terrorism, blockades, insurgency, civil disturbances, riots, or civil unrest; government sanctions, embargoes, or restrictive actions; and explosions or similar catastrophic events. 14.2 Geopolitical and Supply Chain Disruptions The parties recognize that significant geopolitical risks exist in international supply chains, particularly in the context of Middle East tensions, sanctions regimes, and maritime security restrictions. Force Majeure shall specifically include: • Closure, restrictions, or advisories affecting the Strait of Hormuz, Red Sea, Suez Canal, Panama Canal, or other critical maritime chokepoints, which necessitate rerouting of shipments via alternative longer routes (such as the Cape of Good Hope) and cause significant delays and cost increases. • Imposition of secondary sanctions by any government on manufacturers, suppliers, shipping companies, or related entities, preventing normal procurement or supply. • Port closures, blockades, or severe restrictions on shipping due to military conflict, terrorism, or government action. • Manufacturer shutdowns, production halts, or export restrictions imposed by any government on countries of origin of PV equipment. 14.3 Notice of Force Majeure If either party is temporarily unable to meet its obligations due to Force Majeure, that party shall provide written notice to the other party within three (3) business days of the occurrence, describing the event, its impact on contractual performance, and the expected duration. Failure to provide timely notice shall reduce the claiming party's entitlements under this clause. 14.4 Suspension of Obligations During Force Majeure, the obligations of the affected party shall be suspended to the extent prevented by the Force Majeure event. The Contract period shall be extended by the duration of the Force Majeure event. Performance obligations shall resume once the Force Majeure event ceases and the affected party has had reasonable time to remobilize. 14.5 No Liability for Force Majeure Neither party shall be liable to the other for any loss, damage, delay, or failure to perform caused by or arising from Force Majeure. However, the party claiming Force Majeure shall make all reasonable efforts to mitigate the impact and shall inform the other party of steps being taken to resolve the situation and resume performance. 14.6 Prolonged Force Majeure and Termination If Force Majeure continues for more than ninety (90) consecutive days, either party may terminate this Contract upon thirty (30) days' written notice. In the event of such termination, each party shall bear its own costs incurred to date, and the Contractor shall refund to the Client any advance payments received, less documented costs incurred for design, engineering, and procurement. 14.7 Freight Surcharges Due to Disruptions If Force Majeure events (such as maritime chokepoint closures) require rerouting of shipments via longer routes and cause freight cost increases beyond the original quotation, the Contractor shall notify the Client of additional freight costs within seven (7) days of learning of the disruption. The Client shall either accept the additional freight costs or exercise termination rights under Section 14.6. In no case shall increased freight costs due to Force Majeure-driven rerouting be borne by the Contractor. 14.8 Client Delays and Documentation Obligations Any increase in freight costs, surcharges, or demurrage charges arising from delays caused by the Client’s actions, failure to provide necessary import documentation (customs declarations, permits, etc.), or delays in providing Site readiness shall be borne entirely by the Client. The Contractor shall not bear any such additional costs resulting from Client-induced delays.

15. Penalty Against Delay

15.1 Liquidated Damages for Delay If the Contractor fails to complete the Project within the period stipulated in the Commercial & Technical Proposal (Annex-A), and notwithstanding any other provision in this Contract, the Contractor shall be liable to pay the Client liquidated damages (not penalties) equal to 0.05% of the total Contract price for each calendar day of delay beyond the agreed completion date. The Client reserves the right to deduct any such liquidated damages from any unpaid sum remaining to be paid by the Client. 15.2 Carve-Out for Force Majeure Provided, however, that no liquidated damages shall accrue during any period when: (a) the work is suspended pursuant to Section 10 due to the Client's payment default; (b) the work is suspended or delayed due to Force Majeure events under Section 14; or (c) the Site is not ready for installation as described in Section 3.2. 15.3 Sole Remedy Liquidated damages shall be the Client's sole and exclusive remedy for delay. The Client shall not pursue additional claims for damages beyond liquidated damages unless the Contractor has willfully or grossly negligently caused the delay.

16. Assignment and Sub-letting

The Contractor shall not assign, transfer, or sub-let the Contract or any part thereof, or delegate any material portion of the work, or assign any benefit or interest herein to any third party. This clause expressly means that all work necessary to complete the full Project must be executed by the Contractor itself, its directly employed staff, or authorized sub-contractors expressly approved in writing by the Client in advance. Violation of this clause shall hold the Contractor liable for all loss, damage, liability, or claim incurred by the Client, and the Contractor shall pay full compensation to the Client. The Client may terminate the Contract immediately upon discovering unauthorized assignment or sub-letting.

17. Confidentiality

The Contractor acknowledges that all information relating to this Contract, the Client's property, energy consumption data, system design, and business information is confidential. The Contractor shall not disclose, publish, or make use of any such information except insofar as expressly authorized by the Client in writing. This confidentiality obligation shall continue indefinitely, without limitation in time, notwithstanding the expiry or termination of the Contract, unless and until such information comes properly into the public domain through no fault or breach by the Contractor.

18. Intellectual Property

All designs, engineering drawings, technical specifications, software, firmware, and other intellectual property created specifically for the Project shall be owned by the Client upon completion and full payment of the Contract. The Contractor retains ownership of its proprietary methodologies, tools, software, and know-how developed independently of this Project. Manufacturers retain ownership of their equipment specifications, patents, and proprietary technologies.

19. Laws and Dispute Resolution

19.1 Governing Law This Contract shall be governed by and construed in accordance with the laws of the Republic of Maldives. 19.2 Dispute Resolution With the exception of any monetary claims, any dispute, controversy, or disagreement arising from this Contract that cannot be amicably settled between the parties within thirty (30) days of written notice of the dispute shall be finally settled by one or more arbitrators appointed by mutual agreement, with arbitration administered by the Maldives International Arbitration Centre (MIAC) in accordance with MIAC's Rules of Arbitration in force at the time. The seat shall be Male', Maldives; the language shall be English. Both parties may refer any monetary claims arising under this Contract directly to a court of law of competent jurisdiction in the Republic of Maldives.

20. General Provisions

20.1 Additional Services During the tenure of this Contract, should additional supplies, services, or works other than what is stipulated herein become necessary for completing the Project, such additional services must be negotiated in writing. Remuneration shall be mutually agreed upon and documented prior to execution. Should agreement not be reached, the Client shall be free to engage third parties, and the Contractor shall not hinder such parties in their duties. 20.2 Authorized Representatives Any action required or permitted under this Contract may be taken or executed on behalf of the Contractor by any director or officer of Zero Pvt Ltd or the Company's designated representative. The Client reserves reciprocal rights to authorize its own representatives. 20.3 Notices and Communication Any notice, request, or demand required or permitted under this Contract shall be in writing and delivered by hand, registered mail, email, or courier to the parties' addresses specified below or at any address subsequently provided in writing. Notices shall be deemed received when delivered by hand, three (3) business days after registered mail dispatch, or upon email confirmation of receipt. For the Contractor: AE by Zero, Zero Pvt Ltd, 3rd Floor, H. Azum, Ameenee Magu, Male' 20054, Republic of Maldives. Email: info@ae-zero.com 20.4 Collection Rights and Remedies In the event of the Client's default in payment, the Client shall be liable for all costs of collection, including: • Legal fees and court costs • Debt collection agency fees • Interest and penalties at 1.0% per month • All other reasonable expenses incurred in enforcing this Contract 20.5 Severability If any provision of this Contract is held to be invalid, unenforceable, or illegal by a court of competent jurisdiction, the remainder of this Contract shall continue in full force and effect. The parties shall negotiate in good faith to replace any invalid provision with a valid provision having similar intent and effect. 20.6 Survival The provisions of this Contract relating to warranties, maintenance, confidentiality, intellectual property, retention of title, dispute resolution, governing law, and all other provisions reasonably intended to survive shall continue in full force and effect after completion, handover, or termination of this Contract. 20.7 Entire Agreement This Contract, comprising the GCC document and Annex-A (Commercial & Technical Proposal), constitutes the entire agreement between the parties and supersedes all prior negotiations, representations, and understandings, whether written or oral. No amendment or variation of this Contract shall be valid unless made in writing and signed by authorized representatives of both parties. 20.8 Language All documents, correspondence, and communications relating to this Contract shall be in English language. If any translation or interpretation is required, the English version shall prevail in case of any inconsistency.